塑胶跑道对基础地面质量要求如下:
Plastic runway requirements on the quality of ground:
1、基础竣工后,水泥面层不得太光滑,不得有起砂、起壳脱皮和裂纹等现象。
1, the foundation is completed, the cement surface layer shall not be too smooth, do not have sand, shell peeling and crack phenomenon.
2、平整度:3m直尺允许误差3mm以内。
2, evenness: 3M ruler error within 3mm.
3、坡度:符合体育工艺指标。
3, the slope: conforms to the physical process index.
4、抗压强度:R20>25kg/平方厘米
4, the compressive strength: R20>25kg/ cm
R50>10kg/平方厘米
R50>10kg/ square cm
5、基础表面无阻水现象。
5, basic no surface water blocking.
6、保养期: 室外气温25℃以上24天。
6, the maintenance period: outdoor temperature of 25 ℃ for more than 24 days.
室外气温15℃-25℃之间30天。
Outdoor temperature of 15 ℃ -25 ℃ for 30 days.
室外气温25℃以下60天。
The outdoor temperature is below 25 ℃ for 60 days.
(以挥发水泥中的碱性成份,保养期内多浇水)
(the basic components, volatile cement maintenance period much watering)
7、塑胶层铺设前,基础层应无油、无灰、干燥。
7, before laying plastic layer, the base layer shall be free of oil, ash, dry.
主营销售:网球场丙烯酸涂料 壁球弹力胶 人造攀岩板 健身器材
专业施工:跑道 人造草 网球场 篮球场 羽毛球场 壁球馆 泳池 攀岩 健身房 高尔夫球场 体育场馆设施
地址:北京市大兴区小红门路136号兴南大厦B座517
电话:010-87917588 010-87917166
手机:13701062944 18911880255
邮箱:bjspyk@sina.com
传真:010-87918166